Dewhurst Manufacturing Facility Consolidation
Moorebank, NSW
Electrical engineering, distribution, machinery integration, controls, data, CCTV, testing and commissioning for approximately 35 machines across eight production lines.
View Case Study →Home / Projects
Braintric projects
Explore how Braintric delivers electrical infrastructure, renewable energy and smart energy systems across residential, commercial and industrial environments.
From complex manufacturing facilities and commercial solar systems to battery storage and EV infrastructure, our projects demonstrate the engineering, planning and practical delivery behind the solutions we provide.
Featured case study
Dewhurst Manufacturing Facility Consolidation · Moorebank, NSW
Braintric was involved from engineering and planning through electrical construction, machinery integration, controls, testing and commissioning.
The new facility required electrical infrastructure supporting approximately 35 machines across eight production lines, together with new distribution boards, major cable infrastructure, controls, data and CCTV systems.
Project portfolio
Different sites require different engineering approaches. Filter Braintric’s verified projects and approved project scopes by capability.
Moorebank, NSW
Electrical engineering, distribution, machinery integration, controls, data, CCTV, testing and commissioning for approximately 35 machines across eight production lines.
View Case Study →Minto, NSW
120 kW across two sites, delivered from site and interval-data analysis through design, grid approval, switchboard integration, commissioning and monitoring.
View Case Study →Moorebank, NSW
Thermal imaging, three-phase load measurements and engineering assessment documented in a 114-page switchboard inspection report.
View Case Study →Parramatta, NSW
A 10.925 kW Trina Solar array integrated with 48 kWh of usable GoodWe battery storage and a 9.999 kW GoodWe ESA hybrid inverter.
View Project →Sydney, NSW
A confirmed 16.15 kW solar PV system integrated with 41.93 kWh of battery storage for a large residential energy project.
Full case study to be prepared when publication details are approvedSydney, NSW
A 48 kWh two-stack battery configuration with EV charging integration recorded in the project context. Completion and public project details require confirmation.
No case-study link until status is verifiedHow we approach projects
Engineering, delivery and commissioning connected through one disciplined pathway.
Site, operational requirements, constraints and objectives.
Loads, infrastructure, energy requirements and technical options.
Translate requirements into a practical project design.
Coordinate electrical installation and implementation.
Test, configure and prepare systems for operation.
Monitoring, maintenance and future optimisation where appropriate.
Projects across the energy journey
Braintric’s project experience extends across the infrastructure that supplies energy and the technologies that generate, store, monitor and control it.
This integrated capability allows us to look beyond individual products and consider how infrastructure, renewable generation, storage and controls can work together as a complete energy system. It does not imply that every project includes every technology.
Real projects. Real engineering.
Every site has different constraints, loads, equipment and operational priorities. Braintric applies engineering and practical electrical experience across manufacturing facilities, commercial sites and homes adopting solar, battery storage and EV charging.
The objective is not to apply the same solution everywhere. It is to understand the requirement and build the right electrical and energy system around it.
Start with the site
Whether you’re planning a factory relocation, commercial electrical upgrade, solar installation, battery system, EV infrastructure or smarter energy management, involve Braintric early.
Share the essentials and Braintric can focus the first conversation on the site, its energy use and the result you need.